Case Studies

Intumescent Paint

Case Study Intumescent Paint Service: Intumescent Paint Sector: Railway Year delivered: 2025 An introduction As part of the ongoing accessibility upgrades at Northolt Station in London, our team is proud to

Wedding Venue – Compartmentation works

Case Study Wedding Venue Service: Fire Compartmentation Works Sector: Leisure Year delivered: 2025 We were appointed to carry out urgent fire compartmentation works at a popular wedding venue following a detailed

Data Centre

Case Study Data Centre Service: Passive Fire Protection System Sector: Data Centre Year delivered: 2025 Hillmoore Fire Protection successfully delivered a complex passive fire protection project within a major high-security data

Brabazon, South Gloucestershire

Case Study Brabazon, South Gloucestershire Service: Passive Fire Protection System Sector: Education Year delivered: 2024 Hillmoore Fire Protection was appointed to deliver a high-performance passive fire protection system for two electrical

Elizabeth Line, London

Case Study Elizabeth Line, London Service: Durasteel Sector: Rail Year delivered: 2024 The Elizabeth line now has high speed mobile coverage – and Hillmoore Fire Protection were part of making it

Residential, Hastings

Case Study Residential, Hastings Service: Compartmentation Sector: Residential Year delivered: 2024 Our residential client needed a solution for passive fire protection for several of their homes on a new housing complex

Hotels, National 

Case Study Hotels, National Service: Fire Door Surveys Sector: Leisure Year delivered: 2024 We have recently worked closely with an established UK-wide hotel chain to perform surveys to measure the integrity

Rail, London

Case Study Rail, London Service: Door surveys Sector: Transport Year delivered: 2023 Docklands Light Railway (DLR) is an automated light metro system primarily serving the redeveloped Docklands area of London and

Residential, London

Case Study Residential, London Service: Service enclosure Sector: Residential Year delivered: 2023 For three decades, Canary Wharf has been a thriving business, retail, and culture hub. The new neighbourhood, Wood Wharf,

Residential, Southampton

Case Study Residential, Southampton Service: Compartmentation Sector: Residential Year delivered: 2022, 2021 We have been carrying out passive fire protection work for an established housing provider throughout numerous sites in the

London Underground

Case Study London Underground Service: Timber fire doors, steel fire doors Sector: Transport Year delivered: 2022, 2021 In 2021, we carried out passive fire protection measures across two prestigious London underground

Residential block, Essex

Case Study Residential block, Essex Service: Durasteel Sector: Residential Year delivered: 2024 This commercial building was being refurbished into residential apartments. A UKPN substation was located at the bottom of the

Hospital, London

Case Study Hospital, London Service: Fire stopping – Penetration sealing Sector: Healthcare Year delivered: 2023 This hospital is in an old heritage building located in London The problem The hospital had

University, London

Case Study University, London Service: Fire stopping – Penetration sealing Sector: Education Year delivered: 2023 This university has multiple campuses across Southwest London, and we upgraded three buildings on the site.